System Overview:
40 worker nodes with configuration:
2 CPUs – AMD Opteron 250 at 2.6 Ghz
RAM: 4 GB
Disk: 160 GB SATA
Low latency Myrinet card, 4 Gb/s
2 Ethernet controllers 1000 Mb/s
Computing Element (CE):
2 CPUs – AMD Opteron 250 at 2.6 Ghz
RAM: 4 GB
Disk: 160 GB
SATA 2 Ethernet controllers 1 Gb/s
Storage Element (SE):
2 CPUs – AMD Opteron 250 at 2.6 Ghz
RAM: 4 GB
Disk: 36 GB SCSI (SPI-4)
2 Ethernet controllers 1000 Mb/s
4 additional control servers with similar configuration.
2RAID storage systems with total of 8TB storage
BG03-NGCC – High-performance Grid cluster (BG03-NGCC) was in operation from 2008 to 2015.
System Overview:
25 worker nodes, total of 200 CPU cores with configuration:
2 CPUs – Intel Xeon E5430, 4 cores each, at 2.6 Ghz
RAM: 16 GB
Disk: 250 GB SATA 2
Ethernet controllers 1000 Mb/s
Computing Element (CE):
2 CPUs – Intel Xeon E5450, 4 cores each, at 3.0 Ghz
RAM: 16 GB
Disk: 72 GB SAS
2 Ethernet controllers 1000 Mb/s
Storage Element (SE):
2 CPUs – Intel Xeon E5450, 4 cores each, at 3.0 Ghz
RAM: 16 GB
Disk: 72 GB SAS
2 Ethernet controllers 1000 Mb/s
2 additional control servers with similar configuration.
1RAID storage system with total of 24TB storage